Burlington Board of Health Approves Coffee Restaurant Permit at Contaminated Turnpike Site
BURLINGTON — April 8, 2025 — Burlington Board of Health unanimously approves restaurant permit at a contaminated Middlesex Turnpike site and reorganizes its leadership. The board voted 5-0 to grant a special permit to Crackt Kitchen Coffee to construct and operate a 2,500-square-foot restaurant at Zero Middlesex Turnpike, a parcel within an active MCP groundwater remediation area that has been under cleanup since the 1980s. Environmental engineer Christine Mathis told the board construction would not disturb contaminated soils, which are confined to groundwater at depth, and that stormwater infrastructure was already in place from the adjacent Lifetime Living project. The permit carries 15 conditions, including a mandatory vapor barrier, Licensed Site Professional reporting, and a requirement to notify the board of any site or environmental changes. In a separate 5-0 vote, the board elected Gail DeMauri as its new chair and Mary Beth Welch as vice chair, with outgoing chair Dr. Ed Weiner noting that both he and DeMauri had just been re-elected to the board for three more years.
Keep reading with a 14-day free trial
Subscribe to The Burlington MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news